{"MatterTextId":1999,"MatterTextGuid":"8419F68E-7A5B-4AE7-B73F-36F015A14465","MatterTextLastModifiedUtc":"2026-11-06T20:17:58.483","MatterTextRowVersion":"AAAAAABUDLk=","MatterTextMatterId":1970,"MatterTextVersion":"1","MatterTextPlain":"Regional Water System\n\n..title\nTransmission System Valve Improvements; Project No. 101-0673-25; Engineering Services Agreement – Final Engineering\n\n..end\nSUBJECT\n\n..recommendation\nAuthorize funding in the amount of $1,493,100 to Black & Veatch Corporation for an engineering services agreement (ESA) for final engineering design services of the Transmission System Valve Improvements project.\n\n..end\nPURPOSE\n\nThe purpose of the project is to design the installation of new valves or replacement of some existing valves at 15 different high-priority locations within the Water Transmission System. These critical isolation valves are essential to ensuring system reliability, operational flexibility, and safety by allowing for the effective isolation of pipeline segments during system shutdowns.  \n\nRECOMMENDATION\n\nThe Executive Director and NTMWD staff recommend the Board of Directors authorize the Executive Director to execute an engineering services agreement (ESA) as follows:\n\n\nConsultant:\n\tBlack & Veatch Corporation\t\n\t\n\t\n\t\n\tScope:\n \tFinal Engineering Design\t\t\t\n\t\n\tProject:\n\tNo. 101-0673-25, Transmission System Valve Improvements\t\t\t\t\tAmount:\n\t$1,493,100\t\t\t\t\tCommittee:\tThis will be an item on the November 18, 2026, Water Committee meeting agenda.  \n\n\t\t\n\n\n\n\n\nDRIVER(S) FOR THIS PROJECT\n\nStrategic Objective:\t1.3 Proactive Asset and Maintenance Management\n                                                                                             1.4 Reliable and Resilient Systems\t\t\n☐ Regulatory Compliance\t☒ Asset Condition\t\t☐ Capacity\n\t☐ Redundancy/Resiliency\t\t☐ Relocation or External Requests\t☒ Operational Efficiency\t\t☐ Safety\t☐ Administrative\t\t☐ Policy\n\t☐ Other _____________\t\t\nBACKGROUND\n\nThe existing Water Transmission System, consisting of over 700 miles of pipelines, has created challenges for routine maintenance, tie-ins, and hindered scheduling of shutdowns due to older valves requiring repairs or replacement, or the need  for additional valves for proper shutdowns. \n\nAdministrative Memorandum No. 25-6181 authorized an ESA in September 2025 for preliminary engineering services to evaluate the isolation valves within the Water Transmission system and develop an Immediate needs, repair and/or replacement plan, and a Long-term valve improvement plan to Black & Veatch Corporation, in the amount of $1,099,535. \n\nPROJECT PURPOSE\nBased on recommendations from the immediate needs, repair and/or replacement plan developed in preliminary engineering, prepare final design documents for up to 15 critical isolation valves to improve operational efficiency for future shutdowns and maintenance of the Water Transmission system, that are expected to be installed within one shutdown season. \n\nPROJECT COMPONENTS \nFinal design of up to 15 critical valves identified in the plan, including all associated civil, structural, and corrosion protection improvements. \n\nBASIC SERVICES\nProject Management and Administration\nDesign Report \n30%, 60%, and 90% Design Submittals\n100% Contract Documents\nBid Phase Services\nConformed contract documents\n\n\n\n\n\n\nSPECIAL SERVICES\nSubsurface Utility Engineering\nSurveying\nGeotechnical Services\nStructural Design\n\n\nENGINEERING SERVICES FEE\n\nDescription\tAmount\nBasic Services\t $1,064,984\nSpecial Services\t$428,116\nRequested Amount\t$1,493,100\n\nFUNDING \n\nFunding to Black & Veatch Corporation for Final Engineering Services in the amount of $1,493,100 is to be made available in the Regional Water System Construction Funds. \n\t\n","MatterTextRtf":"{\\rtf1\\fbidis\\ansi\\ansicpg1252\\deff0\\deflang1033\\deflangfe1033{\\fonttbl{\\f0\\fswiss\\fprq2\\fcharset0 Arial;}{\\f1\\fmodern\\fprq1\\fcharset128 MS Gothic;}{\\f2\\froman\\fprq2\\fcharset2 Symbol;}}\n{\\colortbl ;\\red255\\green255\\blue255;\\red255\\green0\\blue0;}\n\\viewkind4\\uc1\\pard\\ltrpar\\b\\f0\\fs24 Regional Water System\\par\n\\b0\\par\n\\cf1\\fs2 ..title\\par\n\\cf0\\b\\fs24 Transmission System Valve Improvements; Project No. 101-0673-25; Engineering Services Agreement - Final Engineering\\par\n\\b0\\par\n\\cf1\\fs2 ..end\\par\n\\cf0\\ul\\b\\fs24 SUBJECT\\par\n\\i\\par\n\\cf1\\ulnone\\b0\\i0\\fs2 ..recommendation\\par\n\\cf0\\fs24 Authorize funding in the amount of $1,493,100 to Black & Veatch Corporation for an engineering services agreement (ESA) for final engineering design services of the Transmission System Valve Improvements project.\\par\n\\pard\\ltrpar\\qj\\par\n\\cf1\\fs2 ..end\\par\n\\pard\\ltrpar\\cf0\\ul\\b\\fs24 PURPOSE\\i\\par\n\\pard\\ltrpar\\qc\\ulnone\\b0\\i0\\par\n\\pard\\ltrpar The purpose of the project is to design the installation of new valves or replacement of some existing valves at 15 different high-priority locations within the Water Transmission System. These critical isolation valves are essential to ensuring system reliability, operational flexibility, and safety by allowing for the effective isolation of pipeline segments during system shutdowns.  \\par\n\\ul\\b\\par\nRECOMMENDATION\\par\n\\pard\\ltrpar\\qc\\ulnone\\b0\\par\n\\pard\\ltrpar The Executive Director and NTMWD staff recommend the Board of Directors authorize the Executive Director to execute an engineering services agreement (ESA) as follows:\\par\n\\pard\\ltrpar\\qj\\par\n\\pard\\ltrpar\\cf2\\par\n\\trowd\\trgaph108\\trleft-95\\cellx2245\\cellx9350\\pard\\intbl\\ltrpar\\cf0 Consultant: \\cell Black & Veatch Corporation\\cell\\row\n\\intbl\\cell\\cell\\row\n\\trowd\\trgaph108\\trleft-95\\cellx2245\\cellx9350\\intbl Scope:  \\cell Final Engineering Design\\cell\\row\n\\intbl\\cell\\cell\\row\n\\trowd\\trgaph108\\trleft-95\\cellx2245\\cellx9350\\intbl Project: \\cell No. 101-0673-25, Transmission System Valve Improvements\\cell\\row\n\\intbl\\cell\\cell\\row\n\\trowd\\trgaph108\\trleft-95\\cellx2245\\cellx9350\\intbl Amount: \\cell $1,493,100\\cell\\row\n\\intbl\\cell\\cell\\row\n\\trowd\\trgaph108\\trleft-95\\cellx2245\\cellx9350\\intbl Committee:\\cell This will be an item on the November 18, 2026, Water Committee meeting agenda.    \\cell\\row\n\\pard\\ltrpar\\ul\\b\\par\n\\par\n\\par\n\\par\n\\par\n\\par\nDRIVER(S) FOR THIS PROJECT\\par\n\\par\n\\trowd\\trgaph108\\trleft5\\trbrdrt\\brdrs\\brdrw10 \\trbrdrl\\brdrs\\brdrw10 \\trbrdrb\\brdrs\\brdrw10 \\trbrdrr\\brdrs\\brdrw10 \\clbrdrt\\brdrw15\\brdrs\\clbrdrl\\brdrw15\\brdrs\\clbrdrb\\brdrw15\\brdrs\\clbrdrr\\brdrw15\\brdrs \\cellx2610\\clbrdrt\\brdrw15\\brdrs\\clbrdrl\\brdrw15\\brdrs\\clbrdrb\\brdrw15\\brdrs\\clbrdrr\\brdrw15\\brdrs \\cellx9355\\pard\\intbl\\ltrpar\\ulnone\\b0 Strategic Objective:\\ul\\b\\cell\\ulnone\\b0 1.3 Proactive Asset and Maintenance Management                                                                                              1.4 Reliable and Resilient Systems\\cell\\row\n\\pard\\ltrpar\\par\n\\trowd\\trgaph108\\trleft5\\trbrdrt\\brdrs\\brdrw10 \\trbrdrl\\brdrs\\brdrw10 \\trbrdrb\\brdrs\\brdrw10 \\trbrdrr\\brdrs\\brdrw10 \\clbrdrt\\brdrw15\\brdrs\\clbrdrl\\brdrw15\\brdrs \\cellx5329\\clbrdrt\\brdrw15\\brdrs\\clbrdrr\\brdrw15\\brdrs \\cellx9355\\pard\\intbl\\ltrpar\\f1\\u9744?\\f0  Regulatory Compliance\\cell\\f1\\u9746?\\f0  Asset Condition\\cell\\row\n\\trowd\\trgaph108\\trleft5\\trbrdrt\\brdrs\\brdrw10 \\trbrdrl\\brdrs\\brdrw10 \\trbrdrb\\brdrs\\brdrw10 \\trbrdrr\\brdrs\\brdrw10 \\clbrdrl\\brdrw15\\brdrs \\cellx5329\\clbrdrr\\brdrw15\\brdrs \\cellx9355\\pard\\intbl\\ltrpar\\f1\\u9744?\\f0  Capacity\\cell\\f1\\u9744?\\f0  Redundancy/Resiliency\\cell\\row\n\\f1\\trowd\\trgaph108\\trleft5\\trbrdrt\\brdrs\\brdrw10 \\trbrdrl\\brdrs\\brdrw10 \\trbrdrb\\brdrs\\brdrw10 \\trbrdrr\\brdrs\\brdrw10 \\clbrdrl\\brdrw15\\brdrs \\cellx5329\\clbrdrr\\brdrw15\\brdrs \\cellx9355\\intbl\\u9744?\\f0  Relocation or External Requests\\cell\\f1\\u9746?\\f0  Operational Efficiency\\cell\\row\n\\f1\\trowd\\trgaph108\\trleft5\\trbrdrt\\brdrs\\brdrw10 \\trbrdrl\\brdrs\\brdrw10 \\trbrdrb\\brdrs\\brdrw10 \\trbrdrr\\brdrs\\brdrw10 \\clbrdrl\\brdrw15\\brdrs \\cellx5329\\clbrdrr\\brdrw15\\brdrs \\cellx9355\\intbl\\u9744?\\f0  Safety\\cell\\f1\\u9744?\\f0  Administrative\\cell\\row\n\\trowd\\trgaph108\\trleft5\\trbrdrt\\brdrs\\brdrw10 \\trbrdrl\\brdrs\\brdrw10 \\trbrdrb\\brdrs\\brdrw10 \\trbrdrr\\brdrs\\brdrw10 \\clbrdrl\\brdrw15\\brdrs\\clbrdrb\\brdrw15\\brdrs \\cellx5329\\clbrdrb\\brdrw15\\brdrs\\clbrdrr\\brdrw15\\brdrs \\cellx9355\\pard\\intbl\\ltrpar\\f1\\u9744?\\f0  Policy\\cell\\f1\\u9744?\\f0  Other _____________\\cell\\row\n\\pard\\ltrpar\\par\n\\ul\\b BACKGROUND\\par\n\\pard\\ltrpar\\qc\\ulnone\\b0\\par\n\\pard\\ltrpar The existing Water Transmission System, consisting of over 700 miles of pipelines, has created challenges for routine maintenance, tie-ins, and hindered scheduling of shutdowns due to older valves requiring repairs or replacement, or the need  for additional valves for proper shutdowns. \\par\n\\par\nAdministrative Memorandum No. 25-6181 authorized an ESA in September 2025 for preliminary engineering services to evaluate the isolation valves within the Water Transmission system and develop an Immediate needs, repair and/or replacement plan, and a Long-term valve improvement plan to Black & Veatch Corporation, in the amount of $1,099,535. \\par\n\\pard\\ltrpar\\qj\\par\nPROJECT PURPOSE\\par\n\\pard\\ltrpar\\fi-360\\li720\\f2\\'b7\\tab\\f0 Based on recommendations from the immediate needs, repair and/or replacement plan developed in preliminary engineering, prepare final design documents for up to 15 critical isolation valves to improve operational efficiency for future shutdowns and maintenance of the Water Transmission system, that are expected to be installed within one shutdown season. \\par\n\\pard\\ltrpar\\qj\\par\nPROJECT COMPONENTS \\par\n\\pard\\ltrpar\\fi-360\\li720\\f2\\'b7\\tab\\f0 Final design of up to 15 critical valves identified in the plan, including all associated civil, structural, and corrosion protection improvements. \\par\n\\pard\\ltrpar\\qj\\par\n\\b BASIC SERVICES\\par\n\\pard\\ltrpar\\fi-360\\li720\\qj\\b0\\f2\\'b7\\tab\\f0 Project Management and Administration\\par\n\\f2\\'b7\\tab\\f0 Design Report \\par\n\\f2\\'b7\\tab\\f0 30%, 60%, and 90% Design Submittals\\par\n\\f2\\'b7\\tab\\f0 100% Contract Documents\\par\n\\f2\\'b7\\tab\\f0 Bid Phase Services\\par\n\\f2\\'b7\\tab\\f0 Conformed contract documents\\par\n\\pard\\ltrpar\\qj\\par\n\\b\\par\n\\par\n\\par\n\\par\n\\par\nSPECIAL SERVICES\\par\n\\pard\\ltrpar\\fi-360\\li720\\qj\\b0\\f2\\'b7\\tab\\f0 Subsurface Utility Engineering\\par\n\\f2\\'b7\\tab\\f0 Surveying\\par\n\\f2\\'b7\\tab\\f0 Geotechnical Services\\par\n\\f2\\'b7\\tab\\f0 Structural Design\\par\n\\pard\\ltrpar\\qj\\par\n\\par\nENGINEERING SERVICES FEE\\par\n\\par\n\\pard\\ltrpar\\sl360\\slmult1\\tx6276\\b Description\\tab Amount\\par\n\\pard\\ltrpar\\sl276\\slmult1\\tx6276\\b0 Basic Services\\tab  $1,064,984\\par\nSpecial Services\\tab $428,116\\par\n\\pard\\ltrpar\\tx6276\\b Requested Amount\\tab $1,493,100\\par\n\\pard\\ltrpar\\qj\\b0\\par\n\\pard\\ltrpar\\ul\\b FUNDING \\par\n\\i\\par\n\\ulnone\\b0\\i0 Funding to Black & Veatch Corporation for Final Engineering Services in the amount of $1,493,100 is to be made available in the Regional Water System Construction Funds. \\par\n\\pard\\ltrpar\\qj\\tx1420\\tab\\par\n}\n"}