{"MatterTextId":1993,"MatterTextGuid":"44BB56B7-3AA1-4B17-B841-6ECC69CDE9C3","MatterTextLastModifiedUtc":"2026-11-04T21:29:13.467","MatterTextRowVersion":"AAAAAABUDe4=","MatterTextMatterId":1964,"MatterTextVersion":"1","MatterTextPlain":"Regional Water System\n\n..title\nWylie Water Treatment Plant Conversion to Biologically Active Filtration; Project No. 101-0390-15; Change Order No. 11\n\n..end\nSUBJECT\n\n..recommendation\nAuthorize funding in the amount of $704,669 to RAVA Construction, LLC for Change Order No. 11for replacement of Clearwell 3-2 damaged stop-logs weir wall.\n\n..end\nPURPOSE\n\nDuring initial startup and testing of a newly constructed weir wall, the wall experienced a partial structural failure. Subsequent structural analysis determined the wall design required major modifications or replacement of the wall to function over full operating range of the system. The District staff and Engineer determined that replacement of the existing stop-log design in favor of a cast-in place wall provided the best long-term solution to maintain proper flow metering of the Wylie WTP III’s effluent for chemical flow pacing and completion of the project. \n\nRECOMMENDATION\n\nThe Executive Director, NTMWD staff, and Carollo Engineers, Inc. recommend the Board of Directors authorize a construction change order as follows:\n\nContractor:\n\n\tRAVA Construction, LLC\t\t\t\n\t\n\tScope:\n \tConstruction Change Order No.11\t\t\t\t\tProject:\n\t101-0390-15, Wylie Water Treatment Plant Conversion to Biologically Active Filtration\n\t\t\t\t\tAmount:\n\t$704,669\t\t\t\t\tCommittee:\tThis will be an item on the November 18, 2026, Water Committee meeting agenda.\n\t\t\n\n\n\n\nDRIVER(S) FOR THIS PROJECT\n\nStrategic Objective:\t1.1. High-Quality Services\t\t\n☒ Regulatory Compliance\t☐ Asset Condition\t\t☐ Capacity\t☒ Redundancy/Resiliency\n\t\n\t☐ Relocation or External Requests\t☐ Operational Efficiency\t\t☐ Safety\t☐ Administrative\t\t☐ Policy\t☐ Other _____________\t\t\n\nBACKGROUND\n\n\nPROJECT PURPOSE\nImprove finished water quality by enhancing the removal of organics and thereby producing water less prone to residual disinfection depletion.\nModerate the flow rate variability through the filters to maintain particulate capture and protect against flow-related turbidity volatility. \nAccomplish miscellaneous upgrades to support chemical addition, contact time, polishing capabilities, and in-plant water quality monitoring and control that is critical to effective initial BAF operations.\n\n\nPROJECT COMPONENTS \nFilter control modification at WTP’s II and III involving programmable logic controller (PLC) based filter automation and valve controller improvements. \nMajor piping relocations and interconnections to accommodate revised flow paths.  Major piping includes pipe upsizing and installation of a large flow meter and vault. \nInstallation of chemical injection points and associated piping and trenches.\n\n\nPROPOSED CHANGE ORDER\nThis change order will replace a failed project element with a more robust design.  Original baffle wall design was solely structural steel. Replacement will be a cast-in place concrete wall which is a longer term and more durable solution. \nCarollo Engineers, Inc. and IMEG have agreed to contribute $376,000 toward the cost of this improvement.\n\n\n\n\n\n\nCHANGE ORDER NO. 11\n\nDescription\tAmount\tDays\nOriginal Contract\t$22,375,000.00\t750\nPrior Change Order(s) Total\t$420,561.56\t0\nProposed Change Order No. 11\t\t\nWeir wall replacement\t$704,669.00\t150\nProposed Change Order No. 11 Amounts\t$704,669.00\t0\nRevised Contract Amount\t$23,500,230.56\t900\n\n\nFUNDING \n\nFunding in the amount of $704,669 to RAVA Construction, LLC is to be made available via a $376,000 participation from Carollo Engineers, Inc and IMEG and $328,669 from the Regional Water System Construction Funds.\n\n\n","MatterTextRtf":"{\\rtf1\\fbidis\\ansi\\ansicpg1252\\deff0\\deflang1033\\deflangfe1033{\\fonttbl{\\f0\\fswiss\\fprq2\\fcharset0 Arial;}{\\f1\\fmodern\\fprq1\\fcharset128 MS Gothic;}{\\f2\\froman\\fprq2\\fcharset2 Symbol;}}\n{\\colortbl ;\\red255\\green255\\blue255;}\n\\viewkind4\\uc1\\pard\\ltrpar\\b\\f0\\fs24 Regional Water System\\par\n\\b0\\par\n\\cf1\\fs2 ..title\\par\n\\cf0\\b\\fs24 Wylie Water Treatment Plant Conversion to Biologically Active Filtration; Project No. 101-0390-15; Change Order No. 11\\par\n\\b0\\par\n\\cf1\\fs2 ..end\\par\n\\cf0\\ul\\b\\fs24 SUBJECT\\par\n\\i\\par\n\\cf1\\ulnone\\b0\\i0\\fs2 ..recommendation\\par\n\\cf0\\fs24 Authorize funding in the amount of $704,669 to RAVA Construction, LLC for Change Order No. 11for replacement of Clearwell 3-2 damaged stop-logs weir wall.\\par\n\\pard\\ltrpar\\qj\\par\n\\cf1\\fs2 ..end\\par\n\\pard\\ltrpar\\cf0\\ul\\b\\fs24 PURPOSE\\i\\par\n\\pard\\ltrpar\\qc\\ulnone\\b0\\i0\\par\n\\pard\\ltrpar During initial startup and testing of a newly constructed weir wall, the wall experienced a partial structural failure. Subsequent structural analysis determined the wall design required major modifications or replacement of the wall to function over full operating range of the system. The District staff and Engineer determined that replacement of the existing stop-log design in favor of a cast-in place wall provided the best long-term solution to maintain proper flow metering of the Wylie WTP III\\rquote s effluent for chemical flow pacing and completion of the project. \\par\n\\pard\\ltrpar\\qj\\par\n\\pard\\ltrpar\\ul\\b RECOMMENDATION\\par\n\\pard\\ltrpar\\qc\\ulnone\\b0\\par\n\\pard\\ltrpar The Executive Director, NTMWD staff, and Carollo Engineers, Inc. recommend the Board of Directors authorize a construction change order as follows:\\par\n\\pard\\ltrpar\\qj\\par\n\\trowd\\trgaph108\\trleft-95\\cellx2245\\cellx9350\\pard\\intbl\\ltrpar Contractor: \\cell RAVA Construction, LLC\\cell\\row\n\\intbl\\cell\\cell\\row\n\\trowd\\trgaph108\\trleft-95\\cellx2245\\cellx9350\\intbl Scope:  \\cell Construction Change Order No.11\\cell\\row\n\\intbl\\cell\\cell\\row\n\\trowd\\trgaph108\\trleft-95\\cellx2245\\cellx9350\\intbl Project: \\cell 101-0390-15, Wylie Water Treatment Plant Conversion to Biologically Active Filtration \\cell\\row\n\\intbl\\cell\\cell\\row\n\\trowd\\trgaph108\\trleft-95\\cellx2245\\cellx9350\\intbl Amount: \\cell $704,669\\cell\\row\n\\intbl\\cell\\cell\\row\n\\trowd\\trgaph108\\trleft-95\\cellx2245\\cellx9350\\intbl Committee:\\cell This will be an item on the November 18, 2026, Water Committee meeting agenda. \\cell\\row\n\\pard\\ltrpar\\ul\\b\\par\n\\par\n\\par\n\\par\n\\par\nDRIVER(S) FOR THIS PROJECT\\par\n\\par\n\\trowd\\trgaph108\\trleft5\\trbrdrt\\brdrs\\brdrw10 \\trbrdrl\\brdrs\\brdrw10 \\trbrdrb\\brdrs\\brdrw10 \\trbrdrr\\brdrs\\brdrw10 \\clbrdrt\\brdrw15\\brdrs\\clbrdrl\\brdrw15\\brdrs\\clbrdrb\\brdrw15\\brdrs\\clbrdrr\\brdrw15\\brdrs \\cellx2610\\clbrdrt\\brdrw15\\brdrs\\clbrdrl\\brdrw15\\brdrs\\clbrdrb\\brdrw15\\brdrs\\clbrdrr\\brdrw15\\brdrs \\cellx9355\\pard\\intbl\\ltrpar\\ulnone\\b0 Strategic Objective:\\ul\\b\\cell\\ulnone\\b0 1.1. High-Quality Services\\cell\\row\n\\pard\\ltrpar\\par\n\\trowd\\trgaph108\\trleft5\\trbrdrt\\brdrs\\brdrw10 \\trbrdrl\\brdrs\\brdrw10 \\trbrdrb\\brdrs\\brdrw10 \\trbrdrr\\brdrs\\brdrw10 \\clbrdrt\\brdrw15\\brdrs\\clbrdrl\\brdrw15\\brdrs \\cellx5329\\clbrdrt\\brdrw15\\brdrs\\clbrdrr\\brdrw15\\brdrs \\cellx9355\\pard\\intbl\\ltrpar\\f1\\u9746?\\f0  Regulatory Compliance\\cell\\f1\\u9744?\\f0  Asset Condition\\cell\\row\n\\trowd\\trgaph108\\trleft5\\trbrdrt\\brdrs\\brdrw10 \\trbrdrl\\brdrs\\brdrw10 \\trbrdrb\\brdrs\\brdrw10 \\trbrdrr\\brdrs\\brdrw10 \\clbrdrl\\brdrw15\\brdrs \\cellx5329\\clbrdrr\\brdrw15\\brdrs \\cellx9355\\pard\\intbl\\ltrpar\\f1\\u9744?\\f0  Capacity\\cell\\f1\\u9746?\\f0  Redundancy/Resiliency\\cell\\row\n\\f1\\trowd\\trgaph108\\trleft5\\trbrdrt\\brdrs\\brdrw10 \\trbrdrl\\brdrs\\brdrw10 \\trbrdrb\\brdrs\\brdrw10 \\trbrdrr\\brdrs\\brdrw10 \\clbrdrl\\brdrw15\\brdrs \\cellx5329\\clbrdrr\\brdrw15\\brdrs \\cellx9355\\intbl\\u9744?\\f0  Relocation or External Requests\\cell\\f1\\u9744?\\f0  Operational Efficiency\\cell\\row\n\\f1\\trowd\\trgaph108\\trleft5\\trbrdrt\\brdrs\\brdrw10 \\trbrdrl\\brdrs\\brdrw10 \\trbrdrb\\brdrs\\brdrw10 \\trbrdrr\\brdrs\\brdrw10 \\clbrdrl\\brdrw15\\brdrs \\cellx5329\\clbrdrr\\brdrw15\\brdrs \\cellx9355\\intbl\\u9744?\\f0  Safety\\cell\\f1\\u9744?\\f0  Administrative\\cell\\row\n\\trowd\\trgaph108\\trleft5\\trbrdrt\\brdrs\\brdrw10 \\trbrdrl\\brdrs\\brdrw10 \\trbrdrb\\brdrs\\brdrw10 \\trbrdrr\\brdrs\\brdrw10 \\clbrdrl\\brdrw15\\brdrs\\clbrdrb\\brdrw15\\brdrs \\cellx5329\\clbrdrb\\brdrw15\\brdrs\\clbrdrr\\brdrw15\\brdrs \\cellx9355\\pard\\intbl\\ltrpar\\f1\\u9744?\\f0  Policy\\cell\\f1\\u9744?\\f0  Other _____________\\cell\\row\n\\pard\\ltrpar\\par\n\\ul\\b\\par\nBACKGROUND\\par\n\\pard\\ltrpar\\qc\\ulnone\\b0\\par\n\\pard\\ltrpar\\qj\\par\nPROJECT PURPOSE\\par\n\\pard\\ltrpar\\fi-360\\li720\\f2\\'b7\\tab\\f0 Improve finished water quality by enhancing the removal of organics and thereby producing water less prone to residual disinfection depletion.\\par\n\\f2\\'b7\\tab\\f0 Moderate the flow rate variability through the filters to maintain particulate capture and protect against flow-related turbidity volatility. \\par\n\\f2\\'b7\\tab\\f0 Accomplish miscellaneous upgrades to support chemical addition, contact time, polishing capabilities, and in-plant water quality monitoring and control that is critical to effective initial BAF operations.\\par\n\\pard\\ltrpar\\qj\\b\\par\n\\b0\\par\nPROJECT COMPONENTS \\par\n\\pard\\ltrpar\\fi-360\\li720\\f2\\'b7\\tab\\f0 Filter control modification at WTP\\rquote s II and III involving programmable logic controller (PLC) based filter automation and valve controller improvements. \\par\n\\f2\\'b7\\tab\\f0 Major piping relocations and interconnections to accommodate revised flow paths.  Major piping includes pipe upsizing and installation of a large flow meter and vault. \\par\n\\f2\\'b7\\tab\\f0 Installation of chemical injection points and associated piping and trenches.\\par\n\\pard\\ltrpar\\par\n\\pard\\ltrpar\\qj\\par\nPROPOSED CHANGE ORDER\\par\n\\pard\\ltrpar\\fi-360\\li720\\f2\\'b7\\tab\\f0 This change order will replace a failed project element with a more robust design.  Original baffle wall design was solely structural steel. Replacement will be a cast-in place concrete wall which is a longer term and more durable solution. \\par\n\\f2\\'b7\\tab\\f0 Carollo Engineers, Inc. and IMEG have agreed to contribute $376,000 toward the cost of this improvement.\\par\n\\pard\\ltrpar\\qj\\par\n\\b\\par\n\\par\n\\par\n\\par\n\\par\nCHANGE ORDER NO. 11\\par\n\\b0\\par\n\\pard\\ltrpar\\li108\\sl360\\slmult1\\tx5578\\tx7540\\b Description\\tab Amount\\tab Days\\par\n\\pard\\ltrpar\\li108\\sl276\\slmult1\\tx5578\\tx7540\\b0 Original Contract\\tab $22,375,000.00\\tab 750\\par\nPrior Change Order(s) Total\\tab $420,561.56\\tab 0\\par\n\\b Proposed Change Order No. 11\\tab\\b0\\tab\\par\nWeir wall replacement\\tab $704,669.00\\tab 150\\par\n\\b Proposed Change Order No. 11 Amounts\\tab $704,669.00\\tab 0\\par\nRevised Contract Amount\\tab $23,500,230.56\\tab 900\\par\n\\pard\\ltrpar\\qj\\b0\\par\n\\pard\\ltrpar\\ul\\b\\par\nFUNDING \\par\n\\i\\par\n\\ulnone\\b0\\i0 Funding in the amount of $704,669 to RAVA Construction, LLC is to be made available via a $376,000 participation from Carollo Engineers, Inc and IMEG and $328,669 from the Regional Water System Construction Funds.\\par\n\\pard\\ltrpar\\qj\\par\n\\par\n}\n"}