{"MatterId":12052,"MatterGuid":"7E764032-0210-4FCF-924B-D11A2C8B5720","MatterLastModifiedUtc":"2026-06-03T00:02:31.777","MatterRowVersion":"AAAAAAMX2ws=","MatterFile":"2025-1034","MatterName":null,"MatterTitle":"AUTHORIZE the Chief Executive Officer (CEO) to execute Modification No. 13 to Contract No. AE63445000 with STV Incorporated (STV) in the amount of $43,096,451 to advance project design from 15% advanced conceptual engineering level to 30% preliminary engineering level, and conduct extended third party coordination and approval activities for the K Line Extension to Torrance Project (formerly referred to as the C (Green) Line Extension), increasing the total contract value from $33,404,805 to $76,501,256, and extending the period of performance from June 30, 2026 to May 31, 2029.","MatterTypeId":63,"MatterTypeName":"Contract","MatterStatusId":80,"MatterStatusName":"Agenda Ready","MatterBodyId":174,"MatterBodyName":"Construction Committee","MatterIntroDate":"2025-11-25T00:00:00","MatterAgendaDate":"2026-05-20T00:00:00","MatterPassedDate":null,"MatterEnactmentDate":null,"MatterEnactmentNumber":null,"MatterRequester":"Board of Directors - Regular Board Meeting","MatterNotes":null,"MatterVersion":"1","MatterCost":null,"MatterText1":null,"MatterText2":"harringtonm@metro.net","MatterText3":null,"MatterText4":null,"MatterText5":null,"MatterDate1":null,"MatterDate2":null,"MatterEXText1":"Lily Lopez","MatterEXText2":"Tashai Smith","MatterEXText3":null,"MatterEXText4":null,"MatterEXText5":"Classification success: 2026-06-03T00:12:30 (UTC)","MatterEXText6":null,"MatterEXText7":null,"MatterEXText8":null,"MatterEXText9":null,"MatterEXText10":"Tim Lindholm","MatterEXText11":null,"MatterEXDate1":null,"MatterEXDate2":null,"MatterEXDate3":null,"MatterEXDate4":null,"MatterEXDate5":null,"MatterEXDate6":null,"MatterEXDate7":null,"MatterEXDate8":null,"MatterEXDate9":null,"MatterEXDate10":"2026-06-03T00:12:30","MatterAgiloftId":0,"MatterReference":null,"MatterRestrictViewViaWeb":false,"MatterReports":[]}