{"MatterId":24617,"MatterGuid":"24BF3FC8-5BF6-4EC2-9F30-E24CFFE881CD","MatterLastModifiedUtc":"2026-04-10T16:54:13.117","MatterRowVersion":"AAAAAAFLb/k=","MatterFile":"2026-22525","MatterName":null,"MatterTitle":"3950 NE 15th Court Rd - Waiver to Major Site Plan\nParcel #: 15810-000-17     #WaiverSTA-000457-2026\nFred Bennett\n\nThis item was tabled for two weeks at the 3/30/26 DRC meeting due to the applicant not being present.\n\nLDC 6.14.2(B)(a) Connection requirements\nCODE states (a )New development in the Urban or Rural area shall connect to a centralized water system with available capacity if a water line is within a connection distance of 400 feet times the total number of Equivalent Residential Connections (ERCs)\nAPPLICANT requests a waiver from reconnecting to the public water available.","MatterTypeId":86,"MatterTypeName":"New Business","MatterStatusId":80,"MatterStatusName":"Agenda Ready","MatterBodyId":209,"MatterBodyName":"Development Review Committee","MatterIntroDate":"2026-03-26T00:00:00","MatterAgendaDate":"2026-04-13T00:00:00","MatterPassedDate":null,"MatterEnactmentDate":null,"MatterEnactmentNumber":null,"MatterRequester":"Transportation - County Engineer","MatterNotes":null,"MatterVersion":"1","MatterCost":null,"MatterText1":null,"MatterText2":"Kelly.Hathaway@marionfl.org","MatterText3":null,"MatterText4":null,"MatterText5":null,"MatterDate1":null,"MatterDate2":null,"MatterEXText1":null,"MatterEXText2":null,"MatterEXText3":null,"MatterEXText4":null,"MatterEXText5":null,"MatterEXText6":null,"MatterEXText7":null,"MatterEXText8":null,"MatterEXText9":null,"MatterEXText10":null,"MatterEXText11":null,"MatterEXDate1":null,"MatterEXDate2":null,"MatterEXDate3":null,"MatterEXDate4":null,"MatterEXDate5":null,"MatterEXDate6":null,"MatterEXDate7":null,"MatterEXDate8":null,"MatterEXDate9":null,"MatterEXDate10":null,"MatterAgiloftId":0,"MatterReference":null,"MatterRestrictViewViaWeb":false,"MatterReports":[]}